CNC Precision Part Manufacturing Process Inspection Operation Specifications:
First article inspection, shift change inspection, and machine adjustment inspection are collectively referred to as the first inspection.
First article inspection items: Product appearance, material, and all dimensions of the product at the current process. The inspection results are recorded in the "First Inspection Record".
Shift change inspection items: Dimensions marked with tolerances on the drawing that do not use general tolerance standards, and threaded holes or other items specified in other documents for inspection.
Machine adjustment inspection items: In addition to the items in 3. Shift change inspection, also include dimensions related to the adjusted size. When multiple dimensions are adjusted simultaneously, the full size of the product must be measured.
If the previous process fails the first inspection, the next process may refuse to inspect. For example, if there is no qualified first article inspection report for Process P1, Process P2 refuses to inspect; if the final machining process has no qualified first article inspection report, the final inspection refuses to inspect.
Before sending for first article inspection, production processing personnel must first conduct a self-inspection and record it, and only after confirming OK should they send it to QA for inspection. When sending for inspection, the drawing, self-inspection record, first article inspection report from the previous process, and other materials must be sent together with the product. Also, register in the "First Inspection Registration Form". After the inspection is OK, the quality inspection personnel will affix a qualified label and return the product to production (for large items, notify production to pick up). If the inspection result is不合格, follow the "CNC Process Abnormal Operation Specifications" for execution.
Self-inspection: Production unit operators shall conduct self-inspection and record according to the inspection items specified in the corresponding work instruction, drawing, or other documents, at the corresponding frequency during the process. The main inspection items include: dimensions that can be measured on-site with calipers, thread gauges, micrometers, PIN gauges, go/no-go gauges, and full inspection of product appearance.
In-process inspection: According to the general inspection frequency: dimensions: 1pcs/2H; appearance: 3pcs/2H. If there are SIP materials, follow the SIP requirements. The operator shall record the inspection results truthfully in the "CNC Product Self-Inspection Form" (for single product processing time of less than 5 minutes, the dimension inspection frequency must be increased to: 1 time/1H or 1 time/0.5H).
In-process inspection items: Dimensions marked as precision dimensions/threaded holes/dimensions with directly marked tolerances and outer dimensions on the drawing. During actual inspection, the inspection items can be increased or decreased according to the stability of the product quality.
Final inspection: After cleaning and packaging or before packaging after cleaning, the packaging personnel shall issue the "Final Inspection Submission Form" for inspection. The inspector shall verify whether the physical product and the corresponding materials are consistent, and draw the corresponding number of products according to the following sampling plan for full size inspection. After the inspection is OK, affix a label with the words "Sealed Sample" to the product, and at the same time, enter the inspection actual measurement values into the electronic file "Shipping Inspection Report". After entering, print and sign, and keep the paper file for archiving, to be attached when shipping. (For products that need surface treatment, affix the "Sealed Sample" label after surface treatment)
Full inspection: The inspector first verifies the consistency of the physical product and the drawing, submission form, and other materials; then determines the items that need full inspection according to the drawing information, mainly including: product appearance, dimensions with a tolerance band of less than 0.03mm (excluding form and position tolerance dimensions), and other items that have had customer complaints or customers require full inspection; after the inspection is completed, fill in the "Full Inspection Registration Form" as required, and pay attention to verify materials such as "PMP" to avoid missing processing of the product.
Pre-shipment inspection:
After the full inspection of the product is completed, a dedicated person shall randomly check the inspected items to confirm the effectiveness of the full inspection (sampling level: MIL-STD-105E general II level AQL 1.0). If the random check is qualified, notify the full inspection personnel to proceed to the next process as normal; if the random check is unqualified, return the product to the full inspection personnel for re-inspection.
After the product is cleaned, a dedicated person shall conduct a full inspection of the product appearance, count the product quantity, confirm the packaging method, and verify the shipping label during or after the packaging process.
After the warehouse completes the preparation of goods, notify the quality OQC personnel to confirm that the shipping label is consistent with the delivery order and that there are no hidden dangers in the shipping packaging method.
If the inspector finds any abnormalities during the inspection process, they must follow the provisions of the "CNC Process Abnormal Operation Specifications". For non-conforming products, follow the relevant provisions of the "CNC Non-Conforming Product Control Procedure" and the "Correction and Prevention Measures Control Procedure".